Updated Apr-2022 Premium OG0-092 Exam Engine pdf - Download Free Updated 75 Questions [Q29-Q52]

Share

Updated Apr-2022 Premium OG0-092 Exam Engine pdf - Download Free Updated 75 Questions

Authentic OG0-092 Dumps With 100% Passing Rate Practice Tests Dumps


TOGAF certifications help one upskill in creating the enterprise's architecture using the TOGAF framework. However, they ensure that the applicant is also able to implement and manage the given structure on different levels including data, technology, etc. One of the exams that you need to pass to earn the TOGAF 9 certificate is OG0-092. The first test to pass to acquire this certification is known as OG0-091.


Unit 20: ADM Architecture Requirements Management

The learners must be able to:

  • comprehend the inputs to the stage;
  • comprehend the steps;
  • explain how the steps of Requirements Management comply with the ADM phases;
  • explain the impact of security architecture on the given requirements.
  • explain the function of the Requirements Management outputs;

 

NEW QUESTION 29
Please read this scenario prior to answering the question
You are serving as the Lead Architect for a chain of convenience stores, which has over 2000 retail outlets throughout the Asia-Pacific region. The stores operate 24 hours a day and 7 days a week and use the latest cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.
The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.
An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors.
They have decided to adopt TOGAF 9 within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.
The CIO has stated that the following issues also need to be addressed in the restructuring:
- They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.
- The architecture should focus on the needs of the business, not technology.
- To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.
Refer to the Scenario
[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.] You have been asked to identify the most relevant architecture principles for the current situation.
Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

  • A. IT Responsibility, Data security, Ease of Use, Service Orientation, Common Use Applications.
  • B. Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability.
  • C. Data is Accessible, Data is shared, Interoperability, Requirements Based Change, Control Technical Diversity.
  • D. Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity.

Answer: B

 

NEW QUESTION 30
MightyGears produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there an agreed target architecture. Final decisions on the solutions are not yet fully agreed. They have completed the first pass architecture and now are looking at the best opportunities and solutions to meet their financial goals.
You are the Chief Architect from a consulting organization brought into review the work to date by MightyGears and to make recommendations to the CIO and the board on the opportunities and solutions present.
Refer to the scenario above
Which of the following answers best describes how TOGAF recommends examining the opportunities and solutions before presenting to the board?
Choose one of the following answers

  • A. I would examine the architecture work today ensuring it is complete and accurate and addressing any gaps. I would look at functional and integration requirements. I would then ensure all dependencies are understood and documented. I would then create the necessary artefacts including major work packages and transition architectures and the project charters for the recommended projects for presentation to the board.
  • B. I would assess the architecture work today, create, and priorities projects to transition Widget Inc from the current architecture to target architecture. This will include a business value for each project, the resources required and the intended timing. I would then validate the prioritizations with the board particularly looking at cost benefits and risks. Lastly, I would generate the Architecture Implementation Roadmap and document lessons learned.
  • C. I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizons. I would then look at the architecture work to ensure it is complete and seek to address any gaps. I would review the functional requirements and ensure there are complete interoperability requirements. I would then validate any dependencies and risks. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture required. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.
  • D. I would assess the requirements of the organization particularly those requirements describing the functions required and information flows within the architecture. I would then look to produce artifacts that describe the recommended projects, the risk, issues and dependencies. This would also include transition architects to move us from current architecture to the recommended target architectures. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.

Answer: C

 

NEW QUESTION 31
McKinley Rockets is an enterprise that employs 20,000 men and women in five countries: UK, Italy, France, Spain and the Netherlands and its mission is to guarantee access to space offering space transportation, launch and management of satellite systems at low cost.
A TOGAF 9 mature Enterprise Architecture program is already established within the enterprise. McKinley Rockets strategy is to leverage in the USA shortage of satellite launches availability - that NASA created because of the Shuttle program shutdown - by acquiring an important merican space agency. This will ultimately allow McKinley Rockets to offer its services to the US market. The new acquired company NovaSpace is very successful but with outdated satellite monitoring systems. The CIO is sponsoring an activity to extend the McKinley Rockets' satellite monitoring applications to include the NovaSpace's satellites flock.
A task force of enterprise architects prepared an Architecture Vision and secured the approval. The Architecture Board decided to approve the vision, provided that the Design Definition Document is presented for review at phase D conclusion.
Refer to the scenario above
The Chief Architect asked you as Lead Integration Architect to use TOGAF 9 to recommend the best approach to design the Full Architecture and present it to the Architecture Board.
Identify the best answer accordingly to the TOGAF 9 guidelines.
Choose one of the following answers

  • A. You start with the Business Architecture and then address Data, Application and Technology domains.
    You then Confirm management framework interactions for the Implementation and Migration Plan, Prioritize the migration projects through the conduct of a cost/benefit assessment and risk validation.
    Then perform GapAnalysis and update the Architecture Definition Document.
  • B. You start with the Business Architecture and then address Data, Application and Technology domains.
    For every domain you develop a Baseline and Target Architecture. Then perform Gap Analysis and update the Architecture Definition Document.
  • C. You start with the Business Architecture and then address Technology, Application and Data domains.
    For every domain you select the relevant reference models, viewpoints, and tools. You develop a Target and Baseline Architecture Descriptions. Then perform Gap Analysis, resolve impacts across the Architecture Landscape and update the roadmap. Finally update the Architecture Definition Document.
  • D. You start with the Business Architecture and then address Data, Application and Technology domains.
    For every domain you select the relevant reference models, viewpoints, and tools. You develop a Baseline and Target Architecture. Then perform Gap Analysis, assess the roadmap impacts and finally update the Architecture Definition Document.

Answer: D

 

NEW QUESTION 32
Scenario:
Please read this scenario prior to answering the Question
Your role is that of Lead Enterprise Architect within a vacation property management firm that has been
growing through acquisition. The firm manages over 200 resort properties across North America. Many of the
resort properties use the same internal IT systems that they used before they were acquired. Until recently, the
only requirement that has been placed on each property is that they use a standard financial reporting system
to report their financial results to the headquarters on a weekly basis.
The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to
change. He has defined a new strategic vision that will enhance the business by standardizing its operations
across the network to provide consolidated financial, human resources, logistics, sales and marketing, and
yield management. He has also stated that he expects results by the end of the current fiscal year.
These changes will provide the company with improved utilization of its capacity and more efficient operations.
The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to
improve its ability to target advertising into key markets to improve yields.
The firm has a mature enterprise architecture practice and uses TOGAF 9 as the method and guiding
framework. The CIO is the sponsor of the activity.
In planning this change, the Chief Architect engaged the services of a well-known consulting firm that
specializes in business strategy. An initial study has been conducted to identify the strategic changes needed
to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing
the entire firm, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the firm has taken the decision to adopt a packaged
suite of integrated applications that is tailored to the needs of the hospitality industry.
Refer to the scenario
You have been asked by the Chief Architect to justify the best approach for architecture development to realize
the CEO's vision.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that the team focus on defining the target architecture by going through the architecture
    definition phases (B-D). This is because the initial study identified the need to change. This will ensure that
    the change can be defined in a structured manner and address the requirements needed to realize the
    vision.
  • B. You recommend that the team focus on architecture definition, with a specific emphasis on understanding
    the strategic change parameters of the business strategy. Once understood, the team will be in the best
    position to identify the requirements, drivers, issues, and constraints for this engagement. You would
    ensure that the target architecture addresses non-functional requirements so as to ensure the target
    architecture is robust and secure.
  • C. You recommend that this engagement define the baseline Technology Architecture first in order to assess
    the current infrastructure capacity and capability. Then the focus should be on transition planning and
    architecture deployment. This will identify retirements to ensure that the projects are sequenced in an
    optimal fashion so as to realize the vision.
  • D. You recommend that the target architecture is defined first, followed by transition planning. This is because
    the vision is well understood and the strategic architecture agreed. This will ensure that the current
    problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed
    solution addresses the requirements identified in the initial study.

Answer: C

 

NEW QUESTION 33
Scenario: Global Mobile 1
Please read this scenario prior to answering the question
Global Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. Global Mobile actually has better coverage in nearly all markets than Air Light, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. Global Mobile has selected TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Corporate Board has placed one additional major constraint on the program. In addition to achieving the business outcomes directly related to improving overall customer service within each business unit, the Corporate Board expects the Target Architecture to produce an additional saving of at least 30% over current operating costs through energy efficiency initiatives, virtualization of servers and workstations, and expanded telecommuting and desk-sharing. This Green initiative is intended to become a model for future investments at all company facilities worldwide.
Refer to Global Mobile scenario
You have been engaged as a consultant to advise the Chief Architect on the best ways to approach to the implementation planning activities for this significant business transformation.
Based on TOGAF 9, which of the following is the best answer? (Is this the right answers to choose?)

  • A. You recommend using conventional implementation planning techniques. The Capability-Based Planning approach is normally only used in public sector, defense-related programs. This approach is not appropriate for a private sector company.
  • B. You recommend that the implementation planning activities be conducted using Capability-Based Planning. This is appropriate because the Green initiative is an enterprise-wide plan with a horizontal scope. Its metrics are aggregated at the enterprise level. It is crucial to gain business unit support and cooperation to achieve the broader business outcomes which will benefit all.
  • C. You recommend using conventional implementation planning techniques. The horizontal scope of the Green initiative would make the Capability-Based Planning approach used in the organization's TOGAF-based Enterprise Architecture framework difficult to manage and govern. This approach to planning was better applied within the vertical scope of a business unit.
  • D. The Capability-Based Planning approach used in the organization's TOGAF-based Enterprise Architecture framework is focused on business outcomes. The Green initiative is an infrastructure program that is technical in nature; therefore, it would not be appropriate to use the Capability-Based Planning approach. Instead, the Global Mobile systems development lifecycle approach should be utilized to develop the Solution Architecture.

Answer: B

 

NEW QUESTION 34
Scenario: MegaMart
Case Study Title (Case Study):
MegaMart is a Retail Chain which has expanded throughout India and the Far East.
The CEO and CIO decide that there is a crying need to put an Enterprise Architecture in place to realize MegaMart's strategy to expand its revenue and diversify. The CIO has evaluated and decided to go in for TOGAF9 and adapt it to his enterprise requirements.
The Preliminary and Vision Phase have been completed.
As such very few architectural artifacts exist and the target architecture as of now is not very clear. As the Lead Architect how would you guide your team of architects for the Business Architecture definition?

  • A. In the first iteration start with the definition of the Baseline Business Architecture using a Top Down approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders. Then proceed to Phase C and Phase D. In the next iteration finalize the Target Business Architecture and proceed to Phase C and Phase D.
  • B. In the first iteration start with the definition of the Target Business Architecture using a Top Down approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders proceed to Phase C and Phase D. In the next iteration finalize the Baseline Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document. After analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.
  • C. In the first iteration start with the definition of the Target Business Architecture using a Top down Approach.Then keep on iterating in Phase B till the Target Business Architecture is refined before going to Phase C and Phase D. After Phase C and Phase D are over, iterate again to Phase B and define the baseline Business Architecture, analyze the gaps finalize the Architecture Definitions documents and proceed to Phase C and Phase D.
  • D. In the first iteration start with the definition of the Baseline Business Architecture using a Bottom Up approach. Define the Architecture Definition document after analyzing the impacts and reviewing with the stakeholders'.Proceed to Phase C and Phase D. In the next iteration finalize the Target Business Architecture, determine the gaps and the roadmap, and the impact and update the Architecture Definition document. after analyzing the impacts and reviewing with the stakeholders. Then proceed with the iteration.

Answer: C

 

NEW QUESTION 35
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that develops wind turbines for
use in wind farms. The company has three manufacturing facilities, one in North America, one in Asia, and one
in Europe. Each of these facilities supplies the power industry in its region.
The company recognizes that the long-term technical potential of wind energy can address the current global
dependency on carbon fuels, in order to do so this will require wind turbines to be installed over the large areas
and in areas of higher wind resources. In particular offshore wind farms can contribute substantially more
energy than land stationed turbines.
The research arm of the company has pioneered the development of an offshore wind turbine design, with an
improved turbine blade and power system, that will produce up to 20% more energy. This will allow the
production of significantly more salable energy. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice supported by a cross-functional Architecture
Board and uses the TOGAF standard. The Chief Information Officer and the Chief Operating Officer co-
sponsor the Enterprise Architecture program.
As part of putting the new design into production, a pilot architecture project has defined an updated standard
approach for controlling the automated test systems used to perform final quality assurance. The Chief
Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate
implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new
automated test system controller for each location. The Chief Engineer has expressed concern that a uniform
process be employed at each location to ensure consistency and a low blade failure rate.
Refer to the Scenario
You have been asked to recommend the best approach to address the Chief Engineer's concern.
Based on the TOGAF Standard, Version 9.2, which of the following is the best answer?

  • A. You use the Architecture Contracts to manage the architecture governance processes for the project
    across the locations. You deploy monitoring tools to assess the performance of each completed steam
    turbine at each location and develop change requirements if necessary.
    You recommend that if a deviation from the contract is detected the Architecture Board should modify the
    Architecture Contract to allow the implementation organization the ability to customize the process to meet
    their local needs. As a result, you then issue a new Request for Architecture Work to implement the
    modified Architecture Definition.
  • B. You create an Architecture Contract to manage and govern implementation and migration process at each
    location. For internal development projects, you issue a memorandum of understanding between the
    Architecture Board and the implementation organization. Fir contracts issued to an external party, you
    ensure that it is a fully enforceable legal contract.
    You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers
    whether or not to grant a dispensation to allow the implementation organization to customize the process to
    meet their local needs.
  • C. You create an Architecture Contract to manage and govern the implementation and migration process. If
    the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For
    internal development projects, you decide it is adequate to utilize a memorandum of understanding
    between the Architecture Board and the implementation organization.
    You recommend that if a deviation from the Architecture Contrast is detected, the Architecture Board grant
    a dispensation to allow the implementation organization the ability to customize the process to meet their
    local needs.
  • D. You review the applicable Architecture Contract for each location, ensuring that it addresses the project
    objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is
    issued to an external party, you ensure that it is a legally enforceable contract.
    You schedule compliance reviews at key points in the implementation process to ensure that the work is
    proceeding in accordance with the Architecture Board reviews all deviations from the Architecture Contract,
    and considers whether or not to grant a dispensation to allow the implementation organization to customize
    the process to meet their local needs.

Answer: A

 

NEW QUESTION 36
Scenario: Raxlon Inc.
Case Study Title (Case Study):
Raxlon Inc. is a Fortune 500 Company dealing in high value drugs and pharma products. Its annual turnover is over 120 billion $. It has more than 100,000 employees all over the globe in its R&D, Manufacturing and Marketing Units.
Raxlon's CEO, Dr Peter Fowles, is a pharmacology expert and has over 72 patents on various types of drugs mainly used for treating patients with genetic disorders. Raxlon is now moving into a suite of high end critical drug products used for Genetic Repair of congenital Diseases like Alzhmeir's disease and Epilepsy. Rexlon has a well developed EA practice and in 2009 the EA practice has adopted TOGAF 9 as the primary Framework for Enterprise Architectural Change Agent.
Dr Fowles' main concerns are:
Security of the critical data which they have gained over the years after painstaking research. Although Rexlon had an adequate security system Dr Fowles feels it may not be adequate to deal with the new order of things, especially with data which is highly confidential and if leaked would have major financial impact on the Company.
Dr Fowles calls his CIO and explains his position to him and entrusts whim with the responsibly of evaluating the current security system, operation and governance and determine which are the gaps which need to be addressed during the fresh architectural work. Assume that a new Security Framework would be used in the ADM life cycle. To protect Rexlon's valuable IP.
The CIO apprises the Lead Architect of the sensitive nature of the work he has to complete within the next
2 months.
Identify which of the following processes would be most appropriate for the Lead Architect to adopt in this situation.

  • A. Determine who are the people who are hacking into similar organizations, ensure that highly secure measures are taken when external people enter the R&D and manufacturing locations, ensure that there is a very strong firewall so that people cannot get illicit entry into the system, periodically check the effectiveness of the security measures
  • B. First revisit the Preliminary Phase to determine the tailoring of ADM vis a vis Security. Identify any change in the Principles or additions to be carried out. Engage with all Stakeholders to finalize the Vision. Then in Business, Information systems and Technology Architectures ensure the Security Frame work adopted to the ADM addresses all critical security issues. Finally conduct an overall review to assess how effective the security ecosystem designed is and whether it meets the security level desired
  • C. Identify the sources of threat, review the relevant security statutes, see how disaster recovery can be achieved, find who are the actors vis vis the system and design suitable access control mechanisms, identify critical data and applications and ensure that they are given the highest level of security
  • D. Invoke Preliminary Phase and Vision Phase Identify Sources of threat, review and determine revised regulatory, security and assumptions, document them get management buy in , develop business continuity plans especially for critical data operations, assure data, application and technological component security.

Answer: C

 

NEW QUESTION 37
FreshFruit Int. is an online American grocer. The Executive Board decided to implement a new strategy to expand the business to other markets.
The CIO is sponsoring an enterprise activity to support the expanded operations.
A new solution is rolled-out to replace the legacy online sales platform. A compliance review was performed to assess the solution implementation.
The result of the review highlighted a complaint from the development team stating that the new system is difficult to integrate with the existing warehouse automation systems. The Chief Architect is concerned that the complaint is not related to a real problem of the solution but is based on personal preferences of the development teams. Another interview with the project team is scheduled.
Refer to the scenario above You are the Lead Architect and an architect from your team leads the review team. You have to answer how, based on TOGAF 9, you should enable the review team to conduct the reviews successfully.
Choose one of the following answers

  • A. You organize a meeting with the review team and state the importance to identify any non-compliancy that may have come from the implemented solution.
  • B. Meeting with the project architect you clarify the purpose of the review. You ask to perform an objective and fair review using the checklists to frame the review and clarify that you want them to identify the issues behind the implementation team complaints.
  • C. You verify that criteria for the program and the business objectives are mapped in the checklists that the project team prepared for the interviews. You confirm the checklist content to the project architect and stress the need to be objective and fair during the review process.
  • D. You organize a meeting with the review team and stress the importance of a high degree of compliance without any exception. The review should cover every aspect of the implementation and should criticize the implementation techniques.

Answer: C

 

NEW QUESTION 38
Please read this scenario prior to answering the question
You are serving as the Lead Architect for a chain of convenience stores, which has over 2000 retail outlets throughout the Asia-Pacific region. The stores operate 24 hours a day and 7 days a week and use the latest cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.
The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.
An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF 9 within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.
The CIO has stated that the following issues also need to be addressed in the restructuring:
- They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.
- The architecture should focus on the needs of the business, not technology.
- To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.
Refer to the Scenario
[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.] You have been asked to identify the most relevant architecture principles for the current situation.
Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

  • A. IT Responsibility, Data security, Ease of Use, Service Orientation, Common Use Applications.
  • B. Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability.
  • C. Data is Accessible, Data is shared, Interoperability, Requirements Based Change, Control Technical Diversity.
  • D. Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity.

Answer: B

Explanation:
Explanation/Reference:

 

NEW QUESTION 39
Please read this scenario prior to answering the question
You are serving as the Lead Architect for a chain of convenience stores, which has over 2000 retail outlets throughout the Asia-Pacific region. The stores operate 24 hours a day and 7 days a week and use the latest cloud-based point-of-sale (POS) technology to manage their sales and inventory. Cloud-based POS systems store all user data, including sales and inventory in a remote server.
The cloud-based systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day's weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible. The stores also act as self-service delivery locations for a large online retailer which further increases the number of potential customers entering the stores.
An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors. They have decided to adopt TOGAF 9 within the practice and the first project is to restructure the Enterprise Architecture so that it can better support the existing environment and accommodate future changes of strategy within the company.
The CIO has stated that the following issues also need to be addressed in the restructuring:
- They need to address problems with data quality and inconsistent data in order to support better decision making and analysis.
- The architecture should focus on the needs of the business, not technology.
- To remain competitive, new products and promotions must undergo market trials before deployment across the retail chain. Information systems must be able to manage changes and updates without undue delays.
Refer to the Scenario
[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.] You have been asked to identify the most relevant architecture principles for the current situation.
Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

  • A. IT Responsibility, Data security, Ease of Use, Service Orientation, Common Use Applications.
  • B. Maximize Benefit to the Enterprise, Data Trustee, Data is an Asset, Responsive Change Management, Interoperability.
  • C. Requirements Based Change, Responsive Change Management, Data Trustee, Common Vocabulary and Data Definitions, Business Continuity.
  • D. Data is Accessible, Data is shared, Interoperability, Requirements Based Change, Control Technical Diversity.

Answer: C

 

NEW QUESTION 40
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with
manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been
operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom
developed applications that drive the automated production equipment at each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its
production operations. During a recent exercise held for internal quality improvement, it was determined that a
significant reduction in process waste could be achieved by replacing the current MRPII and scheduling
systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center.
This central system would provide support to each of the plants replacing the functionality in the existing
systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number
of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those
staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature, well-
developed architecture governance and development processes that are strongly based on TOGAF 9.At a
recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief
Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial
architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has
been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the
plant managers have expressed concern about the security and reliability of driving their MRPII and production
scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns
can be addressed.
Refer to the Rollins Manufacturing Scenario
You are serving as the Lead Enterprise Architect of the newly-formed Common ERP Deployment architecture
project team.
As the Common ERP Deployment architecture project team assembles for its initial meeting, many of the
participants have voiced concerns about the sweeping scope of the initiative. Others are confident that they
know a solution that will work. During the meeting, a number of alternative recommendations for how to
proceed are put forward by members of the team.
You have been asked to select the most appropriate recommendation to ensure that the team evaluates
different approaches to the problem and clarifies the requirements for the architecture.
Based on TOGAF 9, which of the following is the best answer?

  • A. The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential
    solutions that will access the concerns of the stakeholders. Based on the findings of that pilot project, a
    complete set of requirements can be developed that will arrive the evolution of the architecture.
  • B. The team should create Baseline and Target Architectures for each of the manufacturing plants. A gap
    analysis between the architectures will then validate the approach, and determine the Transition
    Architecture needed to achieve the target state.
  • C. The team should hold a series of interviews at each of the manufacturing plants using the business
    scenario technique. This will then enable them to identify and document the characteristics of the
    architecture from the business requirements.
  • D. The team should exercise due diligence and carefully research vendor literature and conduct a series of
    briefings with vendors that are on the current approved supplier list. Based on the findings from the
    research, the team should define a preliminary target Architecture Vision. The team should then use that
    model to build consensus among the key stakeholders.

Answer: C

 

NEW QUESTION 41
Scenario: Rollins Manufacturing
Please read this scenario prior to answering the question
Rollins Manufacturing is a major supplier in the automotive industry, headquartered in Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own Manufacturing Requirements Planning (MRPII) system, production scheduling, and custom developed applications that drive the automated production equipment at each plant.
Rollins is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current MRPII and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems.
It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Rollins Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their MRPII and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Rollins Manufacturing Scenario
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project.
One of the earliest initiatives in the Enterprise Architecture program at Rollins was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution.
[Note: You should assume that Rollins has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.] Based on TOGAF 9, which of the following is the best answer?

  • A. Information Management is Everybody's Business, IT Responsibility, Data Trustee, Technology Independence, Responsive Change Management.
  • B. Common-use Applications, Data is Shared, Data is Accessible, Data is Secure, Interoperability, Control Technical Diversity.
  • C. Maximize Benefit to the Enterprise, Business Continuity, Common-use Applications, Data is Shared, Data is Accessible, Data is Secure.
  • D. Business Continuity, Service-orientation, Data is Accessible, Data is Secure, Responsive Change Management.

Answer: C

 

NEW QUESTION 42
An international Insurance company has grown with little consideration for rationalization and consolidation. There is no coordination between business unit and every one have managed its own applications. The CIO decided to establish an Enterprise Architecture program within the enterprise to enable the company to expand to other markets in the next two years. The company has not any Enterprise Architecture Capability in place and the he CIO has set up an Architecture Board and called its first meeting. Refer to the scenario above As Lead Architect you will establish a TOGAF 9 Enterprise Architecture program. Identify the best way to do this among the answers below.
Choose one of the following answers

  • A. You clarify the agreement on key business drivers and the scope of the enterprise architecture. You then clarify the requirements for architecture work. You define the architecture principles together with the help of the Architecture Board in order to lead the architecture work. You consider how to tailor TOGAF 9 for this enterprise.
  • B. As Lead Architect you create a Request for Architecture Work to allocate resources to work on the Architecture Vision. Based on the outcome of the Business Scenario technique you apply, you create the Common Systems Architecture to guide the choice of Solutions Building Blocks. These will be then used for integrating the systems across business units.
  • C. You tailor TOGAF 9 with the help of the Architecture Board to integrate it with the legacy procedures established by the PMO. You also examine the relationship of TOGAF with other processes and frameworks for governance, systems development and operations management. You then define the footprint of the enterprise architecture.
  • D. You conduct an Architecture Maturity Assessment. You then use the TOGAF ADM to state the requirements for the integration of a new company information management system into the organization. You then list a set of business goals together with the Architecture Board that will be a reference to the enterprise architecture program.

Answer: A

 

NEW QUESTION 43
Scenario:
Please read this scenario prior to answering the Question
You have been assigned the role of Chief Enterprise Architect within a leading North American information technology services company. The company has a number of service portfolios including infrastructure, applications, business process outsourcing, accounting, and financial services.
With numerous practice areas and a multitude of diverse engagements underway at any given time, overall engagement management within the company has become challenging. The company does not want to risk its outstanding reputation or its international certifications and CMM ratings.
The Chief Executive Officer and Chief Information Officer have co-sponsored the creation of an Enterprise Architecture prog-am based on TOGAF 9. An Architecture Board has been formed comprised of IT staff executives and executives from the major practice areas.
The Enterprise Architecture team has been working with the Strategic Planning team to create a strategic enterprise architecture to address these issues. The team has defined a framework and held workshops with key stakeholders to define a set of architecture principles to govern the architecture work. They have completed an Architecture Vision at a strategic level and laid out Architecture Definitions for the four domains. They have set out an ambitious vision of the future of the company over a five-year period. This includes a solution architecture including three distinct transformations.
The CIO has made it clear that prior to the approval of the detailed Implementation and Migration plan, the EA team will need to assess the risks associated with the proposed architecture. He has received concerns from some of the senior partners that the proposed architecture may be too ambitious and they are not sure it can produce sufficient value to warrant the attendant risks.
Refer to the Scenario
You have been asked to recommend an approach to satisfy these concerns.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that the EA team apply an interoperability analysis to evaluate any potential issues across the Solution Architecture. This should include the development of a matrix showing the interoperability retirements. Once all of the concerns have been resolved, the EA team should finalize the Architecture Roadmap and the Implementation and Migration Plan.
  • B. You recommend that the EA team apply the Business Transformation Readiness Assessment technique which will allow the risks associated with the transformations to be identified and mitigated for, it will also identify improvement actions to be worked into the Implementation and Migration Plan. A Business Value Assessment should be used to determine the business value and associated risks for the transformation.
  • C. You recommend that before preparing the detailed Implementation and Migration plan, the EA team should review and consolidate the gap analysis results from Phases B to D to understand the transformations that are required to achieve the proposed Target Architecture. The EA team should assess the readiness of the organization to undergo change. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures.
  • D. You recommend that the EA team should gather information about potential solutions from the appropriate sources. Once the Solution Architecture has been assembled, it should be analyzed using a state evolution table to determine the Transition Architectures. A value realization process should then be established to ensure that the concerns raised are addressed.

Answer: B

 

NEW QUESTION 44

  • A. Based on all of these factors they have produced a risk assessment. They have also completed the Implementation and Migration Plan v0.1, the draft Architecture Roadmap, and the Capability Assessment deliverables.
    Because of the risks posed by the complexity of the current environment, it has been determined that a phased approach is needed to implement the target architectures. The overall implementation process is estimated to take several years.
    Refer to the Scenario
    You have been asked to recommend the next steps to prepare the final Implementation and Migration Plan.
    Based on TOGAF, which of the following is the best answer?
  • B. You recommend that the enterprise architects apply the Business Value Assessment Technique to prioritize the implementation projects and project increments. The assessment should focus on return on investment and performance evaluation criteria that can be used to monitor the progress of the architecture transformation. They should confirm the Transition Architecture phases using an Architecture Definition Increments Table to list tine projects. They should then document the lessons learned and generate the final Implementation and Migration Plan.
  • C. You recommend that the enterprise architects assess how the plan impacts the other frameworks in use in the organization. Minimally, the plan should be coordinated with the business planning, portfolio/project management and operations management frameworks. They should then assign a business value to each project, taking into account available resources and priorities for the projects. Finally, they should generate the Implementation and Migration Plan.
  • D. You recommend that the enterprise architects place the Architecture Definition Document under configuration control. This will ensure that the architecture remains relevant and responsive to the needs of the enterprise. They should then produce an Implementation Governance Model to manage the lessons learned prior to finalizing the plan. You recommend that lessons learned be applied as changes to the architecture without review.
  • E. You recommend that the enterprise architects conduct a series of Compliance Assessments to ensure that the architecture is being implemented according to the contract. The Compliance Assessment should verify that the implementation team is using the proper development methodology. It should include deployment of monitoring tools and ensure that performance targets are being met. If they are not met, then changes to performance requirements should be identified and updated in the Implementation and Migration Plan.

Answer: D

 

NEW QUESTION 45
Scenario: AutoComp Corporation
AutoComp Corporation produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there agreed target architecture.
Final decisions on the solutions are not yet fully agreed. They have completed their Vision Phase and first pass of the three architecture definition phases and now they want to finalize and plan their solutions. You are the Chief Architect from a consulting organization brought into review the work to date by AutoComp Corporation and to make recommendations to the CIO and the board on this.
Which of the following answers best describes how TOGAF recommends in this context?

  • A. I would do a Consolidated Gap Analysis by considering then dependencies, then group and allocate the transitions. I would then look to produce artifacts that describe the recommended projects, the risk, issues and dependencies. This would also include transition architects to move us from current architecture to the recommended target architectures. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • B. I would determine the business value of each solution, prioritize accordingly each set of solutions, conduct detailed Risk Assessment and Mitigation, do Compliance reviews and then implement the solutions. I would present my recommendations to the board for agreement. Once this is done, I would update the architectures reflecting any changes resulting from the board discussion.
  • C. I would after confirming Enterprise Change Attributes and constraints, do a Consolidated Gap Analysis then dependencies, then group and allocate the transitions. I would also assess Enterprise readiness and risks. Then I would also assess the business value of the solutions, do risk analysis with mitigation and then schedule the work products.
  • D. I would look at the corporate culture and attitude to change, understand the constraints such as cost and the required time horizons. I would then look at the architecture work to ensure it is complete and seek to address any gaps. I would review the functional requirements and ensure there are complete interoperability requirements. I would then validate any dependencies and risks. Then formulate an implementation and migration strategy identifies major work packages and the transition architecture required. Finally, once agreement is reached with the board I will create project charters and re-factor any changes needed from the board discussion into the architecture.

Answer: D

 

NEW QUESTION 46
FreshFruit Int. is an online American grocer. The Executive Board decided to implement a new strategy to expand the business to other markets.
The CIO is sponsoring an enterprise activity to support the expanded operations.
A new solution is rolled-out to replace the legacy online sales platform. A compliance review was performed to assess the solution implementation.
The result of the review highlighted a complaint from the development team stating that the new system is difficult to integrate with the existing warehouse automation systems. The Chief Architect is concerned that the complaint is not related to a real problem of the solution but is based on personal preferences of the development teams. Another interview with the project team is scheduled.
Refer to the scenario above You are the Lead Architect and an architect from your team leads the review team.
You have to answer how, based on TOGAF 9, you should enable the review team to conduct the reviews successfully.
Choose one of the following answers

  • A. You organize a meeting with the review team and state the importance to identify any non-compliancy that may have come from the implemented solution.
  • B. Meeting with the project architect you clarify the purpose of the review. You ask to perform an objective and fair review using the checklists to frame the review and clarify that you want them to identify the issues behind the implementation team complaints.
  • C. You verify that criteria for the program and the business objectives are mapped in the checklists that the project team prepared for the interviews. You confirm the checklist content to the project architect and stress the need to be objective and fair during the review process.
  • D. You organize a meeting with the review team and stress the importance of a high degree of compliance without any exception. The review should cover every aspect of the implementation and should criticize the implementation techniques.

Answer: C

 

NEW QUESTION 47
Scenario: Raxlon Inc.
Case Study Title (Case Study):
Raxlon Inc. is a Fortune 500 Company dealing in high value drugs and pharma products. Its annual turnover is over 120 billion $. It has more than 100,000 employees all over the globe in its R&D, Manufacturing and Marketing Units.
Raxlon's CEO, Dr Peter Fowles, is a pharmacology expert and has over 72 patents on various types of drugs mainly used for treating patients with genetic disorders. Raxlon is now moving into a suite of high end critical drug products used for Genetic Repair of congenital Diseases like Alzhmeir's disease and Epilepsy. Rexlon has a well developed EA practice and in 2009 the EA practice has adopted TOGAF 9 as the primary Framework for Enterprise Architectural Change Agent.
Dr Fowles' main concerns are:
Security of the critical data which they have gained over the years after painstaking research. Although Rexlon had an adequate security system Dr Fowles feels it may not be adequate to deal with the new order of things, especially with data which is highly confidential and if leaked would have major financial impact on the Company.
Dr Fowles calls his CIO and explains his position to him and entrusts whim with the responsibly of evaluating the current security system, operation and governance and determine which are the gaps which need to be addressed during the fresh architectural work. Assume that a new Security Framework would be used in the ADM life cycle. To protect Rexlon's valuable IP.
The CIO apprises the Lead Architect of the sensitive nature of the work he has to complete within the next 2 months.
Identify which of the following processes would be most appropriate for the Lead Architect to adopt in this situation.

  • A. Determine who are the people who are hacking into similar organizations, ensure that highly secure measures are taken when external people enter the R&D and manufacturing locations, ensure that there is a very strong firewall so that people cannot get illicit entry into the system, periodically check the effectiveness of the security measures
  • B. First revisit the Preliminary Phase to determine the tailoring of ADM vis a vis Security. Identify any change in the Principles or additions to be carried out. Engage with all Stakeholders to finalize the Vision. Then in Business, Information systems and Technology Architectures ensure the Security Frame work adopted to the ADM addresses all critical security issues. Finally conduct an overall review to assess how effective the security ecosystem designed is and whether it meets the security level desired
  • C. Identify the sources of threat, review the relevant security statutes, see how disaster recovery can be achieved, find who are the actors vis vis the system and design suitable access control mechanisms, identify critical data and applications and ensure that they are given the highest level of security
  • D. Invoke Preliminary Phase and Vision Phase Identify Sources of threat, review and determine revised regulatory, security and assumptions, document them get management buy in , develop business continuity plans especially for critical data operations, assure data, application and technological component security.

Answer: C

Explanation:
Explanation/Reference:

 

NEW QUESTION 48
Scenario
Please read this scenario prior to answering the question
You are serving as the Lead Architect for an enterprise architecture project team within a leading multinational pharmaceutical and medical devices manufacturer. Its brands include numerous household names for medications and first aid supplies.
The company has a long history of innovating new treatments for many common illnesses and diseases. Prior to launching a new treatment, the company has to demonstrate its effectiveness and safety in a set of clinical trials that satisfy the regulatory requirements of the countries in the target markets. All clinical trials are undertaken by its research laboratories, which employ over 10,000 people at separate facilities in the United Kingdom, United States, Sweden, France, Canada, India, China and Japan. In addition to internal research and development activities the company is also involved in publicly funded collaborative research projects, with other industrial and academic partners.
The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.
The Enterprise Architecture group is a mature organization. They use the TOGAF 9 ADM with extensions required to support current good manufacturing practices and good laboratory practices in their target markets.
Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the enterprise architecture for the new system will need to be rolled out in stages on a regional basis that minimizes disruptions to ongoing clinical trials.
Refer to the Scenario
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based on TOGAF, which of the following is the best answer?

  • A. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability Increments scheduled into a series of Transition Architectures.
  • B. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using a state evolution table.
  • C. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix.
    Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule the roll out of the work packages to be sequential across the geographic regions.
  • D. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new envelopment, purchased solution, or based on an existing product.
    Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.

Answer: A

 

NEW QUESTION 49
Scenario
Please read this scenario prior to answering the question
Your role is that of Lead Enterprise Architect within the staff headquarters of a large hotel chain. The chain manages over 500 hotels across North America and Canada, with another 230 hotels internationally in the United Kingdom, Europe, Australia and New Zealand. Unlike other hotel chains, which are often a mix of company-owned and franchised units, each hotel in the chain is an independently owned and operated franchise. Many of the hotels use the same internal IT systems that they used before they joined the franchise.
Until recently, the only requirement that has been placed on each hotel is that they use a standard financial reporting system to report their financial results to the headquarters on a weekly basis.
The CEO of the chain has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the business by providing its franchisees new support services including worldwide reservations, global, national and regional marketing as well as consolidated financials, logistics, and yield management. This strategy is part of the long-term commitment to enhance the brand image and drive superior revenue for the chain. He has also stated that he expects improved financial results by the end of the current fiscal year.
These changes will provide the chain with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key national and regional markets to improve yields.
The chain has a mature enterprise architecture practice based in its headquarters and uses TOGAF 9 as the method and guiding framework. The CIO is the sponsor of the activity.
In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO's vision. This recently completed with approval of a strategic architecture encompassing the entire chain, including detailed requirements and recommendations.
Based on the recommendations from the initial study, the chain has taken the decision to adopt a packaged suite of integrated applications that is tailored to the needs of the hospitality industry.
Refer to the scenario
You have been asked by the Chief Architect to propose the best approach for architecture development to realize the CEO's vision.
Based on TOGAF, which of the following is the best answer?

  • A. You propose that the team focus on architecture definition, with a specific emphasis on understanding the strategic change parameters of the business strategy. Once understood, the team will be in the best position to identify the requirements, drivers, issues, and constraints for this engagement. You would ensure that the target architecture addresses non-functional requirements so as to ensure the target architecture is robust and secure.
  • B. You propose that this engagement define the baseline Technology Architecture first in order to assess the current infrastructure capacity and capability. Then the focus should be on transition planning and architecture deployment. This will identify requirements to ensure that the projects are sequenced in an optimal fashion so as to realize the vision.
  • C. You propose that the team focus on defining the target architecture by going through the architecture definition phases (B-D). This is because the initial study identified the need to change. This will ensure that the change can be defined in a structured manner and address the requirements needed to realize the vision.
  • D. You propose that the target architecture is defined first, followed by transition planning. This is because the vision is well understood and the strategic architecture agreed. The target first approach will ensure that the current problems and inefficiencies of the baseline architecture are not carried forward, and that the proposed solution addresses the requirements identified in the initial study.

Answer: C

 

NEW QUESTION 50
Scenario:
Please read this scenario prior to answering the Question
You have been appointed as a consultant to the Lead Enterprise Architect of an international agricultural company that exports bulbs, flowers and seeds worldwide. The company has its headquarters in the Netherlands, and has sales and distribution centers in over 30 countries worldwide. Several of these centers include administrative, manufacturing, and research facilities.
To achieve full integration of their research capabilities with their development centers located in various climate zones, the company wants to develop strong self-directed teams in each location. It also wants to define new business models that are profitable while reducing their impact on the environment. The management team is deeply committed to ensuring that the company is a world leader in socially responsible seed development with a business strategy that focuses on profitability through environmentally friendly operating processes.
The international operations of the company are subject to legal and regulatory requirements for each country where they operate. The production of genetically modified seeds has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was developing pest-resistant seeds.
The Governing Board is concerned about the risks posed in this complex global environment, and as a result has approved the expenditure of resources to establish an Enterprise Architecture program. They have requested to be informed about the status of projects that could impact regulatory compliance. They also want to enable the corporate legal staff and auditors to analyze proposed architectures to ensure that they are within the legal guidelines for a given location. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.
Refer to the Scenario
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Governing Board, legal staff, auditors and the research organization.
Based on TOGAF 9, which of the following is the best answer?

  • A. You recommend that a stakeholder map be developed. This will allow the architects to define groups of stakeholders that share common concerns. A set of views should be defined to address the concerns for each group of stakeholders. Architecture models should then be created for each view to address the stakeholders' concerns.
  • B. You recommend that a special report be created for those groups that have sufficient power and level of interest. This report should summarize the key features of the architecture with respect to the particular location. Each of these reports should reflect the stakeholders1 requirements.
  • C. You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. Stakeholders should then view the models to verify that their concerns have been properly addressed.
  • D. You recommend that each project architecture activity is developed using a consistent modeling approach that is uniform across all architecture projects. Each architecture should be defined based on this fixed set of models so that all concerned parties can examine the models to ensure that their issues and concerns have been addressed.

Answer: A

 

NEW QUESTION 51
Scenario: Vittronics Ltd.
Please read this scenario prior to answering the question
Vittronics Ltd. is a leading medical device manufacturer in the highly competitive market for Migraine Headache
Pain Management (MHPM) devices. These tiny wireless devices are implanted in the brain and can deliver a
precise electric shock when the wearable Pain Control Unit (PCU) detects an increase in stress induced by the
onset of a migraine headache.
This technology will be a breakthrough in the treatment of this condition, and several competitors are striving to
be the first to introduce a product into the market. However, all of them must demonstrate the effectiveness
and safety of their products in a set of clinical trials that will satisfy the regulatory requirements of the countries
in the target markets.
The Enterprise Architecture group at Vittronics has been engaged in an architecture development project to
create a Secure Private Immersive Collaborative Environment (SPICE) that will allow researchers at its product
development laboratories worldwide to share information about their independent clinical trials.
The Vittronics Enterprise Architecture group is a mature organization that has been utilizing TOGAF for several
years. They have recently upgraded to TOGAF 9. The Vittronics Architecture Development Method (VADM) is
strictly based on the TOGAF 9 Architecture Development Method (ADM) with extensions required to support
current good manufacturing practices and good laboratory practices in their target markets.
The SPICE project team has now completed the Business, Information Systems, and Technology Architecture
phases and has produced a complete set of deliverables for each phase. Due to the highly sensitive nature of
the information that is managed in SPICE, special care was taken to ensure that each architecture domain
included an examination of the security and privacy issues that are relevant for each domain. A corresponding
SPICE Security Architecture has been defined.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity.
Refer to the Vittronics Ltd Scenario
You are serving as the Lead Architect for the SPICE project team.
As required by TOGAF, the SPICE project team res completed a Business Transformation Readiness
Assessment in Phase A (Architecture Vision). In that assessment, it was determined that there are risks
associated with the adoption of the Immersive Collaborative Environment. Despite a clear expression of the
vision and the business need for utilizing SPICE to accelerate the clinical trials, the researchers have been
resisting the change because of concerns about safeguarding individually identifiable information about the
subjects who were participating in the trials.
You have been asked to recommend how this situation be managed in the implementation planning phases.
Based on TOGAF 9, which of the following is the best answer?

  • A. You decide to return to Phase A, where the team should brainstorm a technical solution that mitigates the
    residual risks presented by the privacy issue. Then, during Phase D, you will direct the team to develop an
    Architecture Building Block to manage the security risks. After that, the team should select Solution Building
    Blocks that mitigate all of the identified risks and revise the Requirements Impact Statement to reflect the
    changes to the high-level solutions strategy and migration plan.
  • B. You decide that in Phase E, the team creates an overall solutions strategy that can guide the Target
    Architecture implementation and structure the Transition Architectures. You check that there is consensus
    before proceeding.
  • C. You decide that in Phase E, the team review the Business Transformation Readiness Assessment and
    identify, classify, and mitigate the risks associated with the identified readiness factors. If the risks can be
    satisfactorily mitigated, then you would continue to define a high-level solutions strategy that includes the
    Transition Architectures needed to make the change culturally and technically feasible.
  • D. You decide that in Phase E, the team determines an approach to implementing an overall strategic
    direction that will address and mitigate the risks identified.

Answer: A

 

NEW QUESTION 52
......