Try Before You Buy

Download a free sample of any of our exam questions and answers

  • 24/7 customer support, Secure shopping site
  • Free One year updates to match real exam scenarios
  • If you failed your exam after buying our products we will refund the full amount back to you.

[Dec 02, 2023] E_S4HCON2022 Exam Dumps - SAP Practice Test Questions [Q37-Q62]

Share

[Dec 02, 2023] E_S4HCON2022 Exam Dumps - SAP Practice Test Questions

New Real E_S4HCON2022 Exam Dumps Questions

NEW QUESTION # 37
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. A
  • B. Target DB size will increase temporarily
  • C. DMO can only be run with systems NW740 or NW731

Answer: B,C


NEW QUESTION # 38
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in the file umodauto.Ist
  • C. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • D. By searching for transport requests that are assigned to the project SAP_ADJUST

Answer: B


NEW QUESTION # 39
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

  • A. Near-Zero Downtime Maintenance (nZDM)
  • B. Downtime Optimized DMO (DoDMO)
  • C. Near-Zero Downtime Technology (NZDT)
  • D. Downtime Optimized Data Conversion (DoC)

Answer: C


NEW QUESTION # 40
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • B. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.
  • C. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • D. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

Answer: D


NEW QUESTION # 41
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In SUM Phaselist
  • B. In SUM Parameters
  • C. In DMO Migration Preparation
  • D. In Process Control Center

Answer: B,D


NEW QUESTION # 42
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 43
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • B. Import of dictionary objects from the download directory in phase DDIC_UPG
  • C. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • D. Activation of dictionary objects in phase ACT_UPG
  • E. Import of upgrade and language data from the download directory in phase TABIM UPG

Answer: B,D,E


NEW QUESTION # 44
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Using DMO when applying Support Packages to SAP ECC 6.07
  • B. Updating to SAP ECC 6.07 using DMO
  • C. Upgrading to SAP ECC 6.08 without using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

Answer: C,D


NEW QUESTION # 45
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. An additional temporary database is used during uptime
  • C. Dedicated application tables are migrated in uptime
  • D. TABIMJJPG is executed in uptime

Answer: C


NEW QUESTION # 46
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Database migration
  • B. Homogenous system copy
  • C. Dual Stack split
  • D. Release upgrade
  • E. Support Package Stack update

Answer: A,D,E


NEW QUESTION # 47
ICNV initialization does 3

  • A. Creation of views
  • B. AA
  • C. Build index on flag column
  • D. Creation of flag

Answer: A,C,D


NEW QUESTION # 48
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:

  • A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • B. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
  • C. In the corresponding R3trans log files of this phase
  • D. In the job log for the corresponding job in SM37 (Job Overview)

Answer: B,D


NEW QUESTION # 49
You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

  • A. An SAP S4HANA 1709 sandbox system
  • B. AA
  • C. A Standalone SAP system with ABAP 7.51 or above

Answer: A,C


NEW QUESTION # 50
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • B. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

Answer: D


NEW QUESTION # 51
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored in file sumabap conf during registration
  • B. The path is taken from the URL entered in the browser to start SUM
  • C. The path was stored to the environment of user <sid>adm during registration
  • D. The path was stored in file host_profile during registration

Answer: A


NEW QUESTION # 52
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • B. SAP S/4HANA conversion including database migration and Unicode conversion
  • C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • D. Unicode conversion SAP S/4HANA conversion including database migration
  • E. Unicode conversion SAP S/4HANA conversion without database migration Database migration

Answer: A,C,D


NEW QUESTION # 53
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for source release, Windows, SAP MaxDB

Answer: C,D


NEW QUESTION # 54
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:

  • A. Check logs for jobs starting with "RSUPG_SGEN" in the system
  • B. Check the "Charts Control Center" in the SUM UI
  • C. Check the dump size of the database export on disk
  • D. Check the log files written under "SUM\abap\log"

Answer: B,D


NEW QUESTION # 55
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The benchmaking option allows you to migration a specified set of tables
  • B. The repetition option allows you to run the migration without a shadow system
  • C. The repetition option allows you to repeat the complete migration
  • D. The benchmaking option allows you to repeat the uptime migration

Answer: A


NEW QUESTION # 56
You are performing an SAP S/4HANA conversion with DMO as an inplace migration. How does SUM transfer the data by default from the source database to the target database during the migration?

  • A. Using R3load and network socket connection
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and memory pipes

Answer: D


NEW QUESTION # 57
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the SUM technical downtime
  • B. During the Execution roadmap step
  • C. Before the start of the SUM technical downtime
  • D. After SUM has ended

Answer: A


NEW QUESTION # 58
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

Answer: A


NEW QUESTION # 59
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:

  • A. Switch to new repository (EU_SWITCH)
  • B. Activation of dictionary objects (ACT_UPG)
  • C. Conversion of application tables (PARCONVJJPG)
  • D. Modification adjustment (SPDD)

Answer: B,D


NEW QUESTION # 60
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It does NOT perform any table comparison.
  • B. It performs a comparison on selected tables using check sum.
  • C. It performs a comparison on all tables using row counts.
  • D. It performs a comparison of all tables using check sum.

Answer: C


NEW QUESTION # 61
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

  • A. SAP S/4HANA conversion without DMO
  • B. Benchmark tool
  • C. Prerequisite check
  • D. SAP S/4HANA conversion including DMO
  • E. DMO without system update

Answer: A,C,D


NEW QUESTION # 62
......

Pass Your E_S4HCON2022 Exam Easily with Accurate PDF Questions: https://pass4sure.examstorrent.com/E_S4HCON2022-exam-dumps-torrent.html