SAP C_TS422_2022 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Master Data in SAP S/4HANA | >12% | - Work Centers and Routings - Material Master - Bill of Materials (BOM) - Production Versions |
| Introduction to SAP S/4HANA Production Planning | <8% | - Innovation and Simplification in S/4HANA - Overview of Manufacturing Processes |
| Demand Management | <8% | - Consumption Strategies - Planned Independent Requirements |
| Material Requirements Planning (MRP) | 8%–12% | - MRP Logic and Net Requirements Calculation - Lot-Sizing Procedures - MRP Evaluation and Exception Messages |
| Production Orders in SAP S/4HANA | >12% | - Availability Check - Order Creation and Release - Order Confirmation and Goods Movement - Order Settlement and Archiving |
| Capacity Planning | 8%–12% | - Work Center Scheduling - Capacity Evaluation - Capacity Levelling |
| Process Orders | <8% | - Master Data for Process Industries - Process Order Creation and Execution |
| Advanced Planning in SAP S/4HANA | >12% | - Long-Term Planning - Planning Strategies - Demand-Driven MRP |
| Lean Manufacturing | 8%–12% | - Kanban and Pull-Based Production - Repetitive Manufacturing - Process Efficiency Improvements |
What C_TS422_2022 Candidates Want to Know
The SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing questions are written and organized by senior experts and experienced specialists so that your study time concentrates on the most test-relevant knowledge. Instead of spreading your effort across endless coverage, you practice what the C_TS422_2022 exam actually weighs, which raises your learning efficiency session by session.
The real C_TS422_2022 exam gives you 180 minutes minutes for 80 questions. Rehearsing under the same conditions on the ExamsTorrent engine builds the pacing you will rely on.
- Material Requirements Planning (MRP) (8%–12%)
- Lean Manufacturing (8%–12%)
- Introduction to SAP S/4HANA Production Planning (<8%)
Let the weights decide where your hours go first.
Three versions cover different working lives. The PDF downloads for learning at any time. The PC test engine runs on unlimited computers, so you can study on screens at home and at the workplace. The online engine works on any electronic equipment, with no device limit and offline use supported, so practice never depends on your location.
The package contains 82 practice questions for the C_TS422_2022 exam, all verified by senior experts and organized for focused, efficient revision.
To pass C_TS422_2022 you need 65%, and the official exam fee is ~$534–$541 USD (varies by region). Fixing both figures early keeps your target concrete and your budget planned.
SAP Training & Certification Shop: register for C_TS422_2022
TS421 – Manufacturing in SAP S/4HANA: Visit official page
TS422 – Production Planning in SAP S/4HANA: Visit official page
No mandatory prerequisites; recommended: basic knowledge of SAP S/4HANA, production planning, and manufacturing processes
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Sample Questions:
Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.
what is the impact of this decision?
Note: there are 2 correct answers to this question
- A. Production orders are created with sales order reference.
- B. Sales orders have to be ATP-confirmed (available-to-promise) to saved.
- C. Both the reduction of make-to-order stock and requirements occur on delivery
- D. Storage Location MRP areas are required for sales-orders-specific stock.
- E. Net requirement calculation is carried out for every sales order individually.
Correct Answer: A,E 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Production supply area
- B. Replenishment strategy
- C. Rate routing
- D. Control cycle
Correct Answer: D 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Validity period or sales order
- B. Planned order or material number
- C. Lot size or material cost
- D. Alphanumeric or quota arrangement
Correct Answer: A 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
- A. Advanced Planning
- B. Consumption-Based Planning
- C. Manual Planning Without Check
- D. Material Requirements Planning
Correct Answer: B 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?
- A. Squeeze in
- B. Insert operation
- C. Find Slot
- D. Schedule in working time only
Correct Answer: C 🗳️
Explanation: Only visible for ExamsTorrent members. You can sign-up / login (it's free).